2025-05-22 12:49 |
[GSI-2025-00774]
Book/Report
CBM ; Herrmann, N. ; Sturm, C.
mCBM@SIS18 2023/24
[2022]
GSI : CBM, CBM Proposals 12 p. (2022)2022
This beam time application submitted in June 2022 is a continuation request by the CBM Collaboration to the General Program Advisory Committee (G-PAC) of GSI/FAIR, following the proposals which were granted in 2017 [4] and 2020 [5] within the FAIR phase-0 program of GSI / FAIR. The primary aim of mCBM@SIS18 (short “mCBM”) is to commission and optimize the complex interplay of the different detector systems with the triggerless-streaming data acquisition and the fast online event reconstruction and selection under realistic experiment conditions up to the top CBM interaction rate of 10 MHz. [...]
Restricted: PDF PDF (PDFA);
Detailed record - Similar records
|
2025-05-22 12:43 |
[GSI-2025-00773]
Book/Report
CBM ; Herrmann, N. ; Sturm, C.
mCBM@SIS18 2012/22
[2020]
GSI : CBM, CBM Proposals 79 p (2020)2020
This beam time application submitted in June 2020 is a continuation request by the CBM Collaboration, following the proposal on the CBM full-system test-setup at the SIS18 facility under the name mCBM@SIS18 (short “mCBM”), which was fully granted in September 2017. The primary aim of the mCBM setup is to commission and optimize the complex interplay of the different detector systems with the triggerless-streaming data acquisition and the fast online event reconstruction and selection. [...]
Restricted: PDF PDF (PDFA);
Detailed record - Similar records
|
2025-04-17 14:31 |
Detailed record - Similar records
|
2024-06-26 17:35 |
Detailed record - Similar records
|
2021-12-10 13:43 |
Detailed record - Similar records
|
|
|