%0 Book Section
%A Breidert, A.
%A Schroeder, C. H.
%A Beusch, A.
%A Kauschke, M.
%A Streicher, B.
%A Walter, F.
%A Kollmus, H.
%T Status and commissioning of the Helium Supply Plant (HeSu) and the Series Test Facility (STF)
%V 2015-1
%N GSI Report 2015-1
%@ 0171-4546
%C Darmstadt
%I GSI Helmholtzzentrum für Schwerionenforschung
%M GSI-SR2014-FG-CS-03
%M GSI Report 2015-1
%B GSI Report
%P 507 p.
%D 2015
%Z psp 2.14.8.1.5; 2.14.8.1.6   FAIR
%< Scientific Report 2014
%F PUB:(DE-HGF)7 ; PUB:(DE-HGF)15
%9 Contribution to a bookInternal Report
%R 10.15120/GR-2015-1-FG-CS-03
%U https://repository.gsi.de/record/184215