TY  - CHAP
AU  - Breidert, A.
AU  - Schroeder, C. H.
AU  - Beusch, A.
AU  - Kauschke, M.
AU  - Streicher, B.
AU  - Walter, F.
AU  - Kollmus, H.
TI  - Status and commissioning of the Helium Supply Plant (HeSu) and the Series Test Facility (STF)
VL  - 2015-1
IS  - GSI Report 2015-1
SN  - 0171-4546
CY  - Darmstadt
PB  - GSI Helmholtzzentrum für Schwerionenforschung
M1  - GSI-SR2014-FG-CS-03
M1  - GSI Report 2015-1
T2  - GSI Report
SP  - 507 p.
PY  - 2015
N1  - psp 2.14.8.1.5; 2.14.8.1.6   FAIR
LB  - PUB:(DE-HGF)7 ; PUB:(DE-HGF)15
DO  - DOI:10.15120/GR-2015-1-FG-CS-03
UR  - https://repository.gsi.de/record/184215
ER  -