001     204752
005     20230208173709.0
024 7 _ |a G:(EU-Grant)731125
|d 731125
|2 CORDIS
024 7 _ |a G:(EU-Call)H2020-LCE-2016-SGS
|d H2020-LCE-2016-SGS
|2 CORDIS
024 7 _ |a corda__h2020::731125
|2 originalID
035 _ _ |a G:(EU-Grant)731125
150 _ _ |a Unlocking European grid local flexibility trough augmented energy conversion capabilities at district-level
|y 2016-12-01 - 2019-11-30
371 _ _ |a TRACTEBEL IMPACT BELGIUM SA
|b Tractebel Impact
|d Belgium
|v CORDIS
371 _ _ |a Cardiff University
|b Cardiff University
|d United Kingdom
|e http://www.cardiff.ac.uk/
|v CORDIS
371 _ _ |a R2M SOLUTION SRL
|d Italy
|e http://www.r2msolution.com
|v CORDIS
371 _ _ |a Tractebel Engineering (Belgium)
|b Tractebel Engineering (Belgium)
|d Belgium
|e http://www.tractebel-engie.com/
|v CORDIS
371 _ _ |a CSEM CENTRE SUISSE D'ELECTRONIQUE ET DE MICROTECHNIQUE SA - RECHERCHE ET DEVELOPPEMENT
|b CSEM
|d Switzerland
|e http://www.csem.ch
|v CORDIS
371 _ _ |a HSR Hochschule für Technik Rapperswil
|b HSR
|d Switzerland
|e http://www.hsr.ch/
|v CORDIS
371 _ _ |a Atomic Energy and Alternative Energies Commission
|b CEA
|d France
|e http://www.cea.fr/
|v CORDIS
371 _ _ |a SCHNEIDER ELECTRIC SPA
|d Italy
|e http://www.schneiderelectric.it
|v CORDIS
371 _ _ |a BLAENAU GWENT COUNTY BOROUGH COUNCIL
|b BGCBC
|d United Kingdom
|e http://WWW.BLAENAU-GWENT.GOV.UK
|v CORDIS
371 _ _ |a École Polytechnique Fédérale de Lausanne
|b EPFL
|d Switzerland
|e http://www.epfl.ch/index.en.html
|v CORDIS
371 _ _ |a EXERGY LTD
|b EXERGY
|d United Kingdom
|e http://www.exergy.uk.com
|v CORDIS
372 _ _ |a H2020-LCE-2016-SGS
|s 2016-12-01
|t 2019-11-30
450 _ _ |a PENTAGON
|w d
|y 2016-12-01 - 2019-11-30
510 1 _ |0 I:(DE-588b)5098525-5
|a European Union
|2 CORDIS
680 _ _ |a Pentagon is a 3-years research and innovation project that will investigate the potential of wider deployment of energy conversion technologies and strategies at district-level, with the aim to foster flexibility in the low-voltage and medium-voltage grid. The rationale that underlies Pentagon approach is that multi-vector smart districts can be the key enablers of future smart grids, provided their flexibility capabilities are augmented with adequate energy conversion technologies. To this end, Pentagon will deliver two key technology assets: a highly efficient power-to-gas installation sized for coupling with typical district heating plants and a multi-vector multi-scale district energy management platform for the combined monitoring and management of all district energy carriers. The power-to-gas technology will achieve a 15 to 25% energy gain compared to state-of-the-art performances. The multi-vector multi-scale district energy management platform will achieve 15 to 20% more flexibility at district-level, allowing for a 25% increase of renewable penetration, by leveraging building and district power to heat conversion capabilities. These impacts will be thoroughly assessed through an iterative validation and demonstration roadmap that will start with lab-scale individual component testing, continue with a focused deployment in district-scale experimental facilities, and conclude with a wider simulation-based assessment at distribution grid level that will rely on a real smart district from a project partner. Based on the results of the validation and demonstration, Pentagon will be able to implement an exploitation roadmap aimed both at (a) preparing the commercialization of the results (5-years post-project horizon) and (b) the definition and targeted dissemination of innovative local energy aggregation business models, leveraging a 200+ member stakeholder community and connections between PENTAGON and relevant market design standardization initiatives.
909 C O |o oai:juser.fz-juelich.de:833529
|p authority:GRANT
|p authority
909 C O |o oai:juser.fz-juelich.de:833529
970 _ _ |a oai:dnet:corda__h2020::45f7a43847266419ad274d3d79b24a29
980 _ _ |a G
980 _ _ |a CORDIS
980 _ _ |a AUTHORITY


LibraryCollectionCLSMajorCLSMinorLanguageAuthor
Marc 21