%0 Conference Paper
%A Hähnel, Hendrik
%A Ates, Adem
%A Dedic, Benjamin
%A Wagner, Christopher
%A Zhang, Chuan
%A Podlech, Holger
%A Kümpel, Klaus
%A Bauer, Leonie
%A Ratzinger, Ulrich
%Y Jaje, Kelly
%Y Bishofberger, Kip
%Y Brody, Ryan
%Y Bruno, Gustavo
%Y Chrin, Jan
%Y Eyberger, Cathy
%Y Montes, Maggie
%Y Skiadopoulos, Denise
%Y Wang, Ling
%Y Wootton, Kent
%T Current status of beam commissioning at the Frankfurt Neutron Source
%I JACoW Publishing
%M GSI-2024-01130
%P 371-374 pages
%D 2024
%Z Published by JACoW Publishing under the terms of the Creative Commons Attribution 4.0 license.
%X The Frankfurt Neutron Source FRANZ will be a compact accelerator driven neutron source utilizing the 7Li(p,n)7Be reaction with a 2 MeV proton beam. Follwoing successful beam commissioning of the 700 keV proton RFQ, further beam experiments including emittance measurements are currently ongoning. Preparations for conditioning and commissioning of the IH-DTL are running in parallel to the current beam measurement campaign. We report on the current status of commissioning towards a 2 MeV proton beam.
%B 32nd Accelerator Conference
%C 25 Aug 2024 - 30 Aug 2024, Chicago, illinois (USA)
Y2 25 Aug 2024 - 30 Aug 2024
M2 Chicago, illinois, USA
%K Accelerator Physics (Other)
%K mc3-proton-and-ion-accelerators-and-applications - MC3: Proton and Ion Accelerators and Applications (Other)
%K MC3.6 - MC3.6 Room temperature structures (Other)
%F PUB:(DE-HGF)8
%9 Contribution to a conference proceedings
%R 10.18429/JACOW-LINAC2024-TUPB021
%U https://repository.gsi.de/record/354650