TY - CONF
AU - Hähnel, Hendrik
AU - Ates, Adem
AU - Dedic, Benjamin
AU - Wagner, Christopher
AU - Zhang, Chuan
AU - Podlech, Holger
AU - Kümpel, Klaus
AU - Bauer, Leonie
AU - Ratzinger, Ulrich
A3 - Jaje, Kelly
A3 - Bishofberger, Kip
A3 - Brody, Ryan
A3 - Bruno, Gustavo
A3 - Chrin, Jan
A3 - Eyberger, Cathy
A3 - Montes, Maggie
A3 - Skiadopoulos, Denise
A3 - Wang, Ling
A3 - Wootton, Kent
TI - Current status of beam commissioning at the Frankfurt Neutron Source
PB - JACoW Publishing
M1 - GSI-2024-01130
SP - 371-374 pages
PY - 2024
N1 - Published by JACoW Publishing under the terms of the Creative Commons Attribution 4.0 license.
AB - The Frankfurt Neutron Source FRANZ will be a compact accelerator driven neutron source utilizing the 7Li(p,n)7Be reaction with a 2 MeV proton beam. Follwoing successful beam commissioning of the 700 keV proton RFQ, further beam experiments including emittance measurements are currently ongoning. Preparations for conditioning and commissioning of the IH-DTL are running in parallel to the current beam measurement campaign. We report on the current status of commissioning towards a 2 MeV proton beam.
T2 - 32nd Accelerator Conference
CY - 25 Aug 2024 - 30 Aug 2024, Chicago, illinois (USA)
Y2 - 25 Aug 2024 - 30 Aug 2024
M2 - Chicago, illinois, USA
KW - Accelerator Physics (Other)
KW - mc3-proton-and-ion-accelerators-and-applications - MC3: Proton and Ion Accelerators and Applications (Other)
KW - MC3.6 - MC3.6 Room temperature structures (Other)
LB - PUB:(DE-HGF)8
DO - DOI:10.18429/JACOW-LINAC2024-TUPB021
UR - https://repository.gsi.de/record/354650
ER -