TY - RPRT AU - Herrmann, Norbert AU - Sturm, Christian TI - mCBM@SIS18 2021/22 IS - 2020 CY - Darmstadt PB - GSI Helmholtzzentrum für Schwerionenforschung GmbH M1 - GSI-2025-00773 M1 - 2020 T2 - CBM Proposals SP - 86 p. PY - 2025 AB - This beam time application submitted in June 2020 is a continuation request by the CBM Collaboration, following the proposal on the CBM full-system test-setup at the SIS18 facility under the name mCBM@SIS18 (short “mCBM”), which was fully granted in September 2017. The primary aim of the mCBM setup is to commission and optimize the complex interplay of the different detector systems with the triggerless-streaming data acquisition and the fast online event reconstruction and selection. In particular, it allows testing of the detector and electronics components developed for the CBM experiment as well as the corresponding online/offline software packages under realistic experiment conditions up to the top CBM interaction rates of 10 MHz. LB - PUB:(DE-HGF)3 ; PUB:(DE-HGF)29 DO - DOI:10.15120/GSI-2025-00773 UR - https://repository.gsi.de/record/359717 ER -