| Hauptseite > Publikationsdatenbank > Current status of beam commissioning at the Frankfurt Neutron Source |
| Contribution to a conference proceedings | GSI-2026-00262 |
; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ;
2025
JACoW Publishing
Please use a persistent id in citations: doi:10.18429/JACOW-IPAC2025-TUPS039 doi:10.15120/GSI-2026-00262
Abstract: The Frankfurt Neutron Source FRANZ will be a compact accelerator driven neutron source utilizing the 7Li(p,n)7Be reaction with a 2 MeV proton beam. The 700 keV RFQ has been sucessfully commissioned with a 10 mA proton beam. Conditioning of the subsequent IH-type cavity has been performed up to 10 kW. We also report on RFQ emittance measurements performed with a slit grid emittance device. In addition, a fast faraday cup (FFC) was used for bunch shape measurements behind the RFQ.
Keyword(s): Accelerator Physics ; mc4-hadron-accelerators - MC4: Hadron Accelerators ; MC4.A08 - MC4.A08 Linear Accelerators
|
The record appears in these collections: |