| Hauptseite > Publikationsdatenbank > Development of a spill-structure manipulation cavity and first experiment with beam in SIS18 |
| Contribution to a conference proceedings/Contribution to a book | GSI-2025-00013 |
; ; ; ; ; ; ; ; ;
2024
JACoW Publishing
Please use a persistent id in citations: doi:10.18429/JACOW-IPAC2024-TUPR07 doi:10.15120/GSI-2025-00013
Abstract: For several years, significant effort has been spent at GSI to improve the time structure of the spill during slow extraction in SIS18. This led to the requirement to extend the possibilities to experimentally improve the micro-spill structure by partially or fully capturing the beam with an RF of more than 40 MHz. Therefore, a so-called spill-structure manipulation cavity was designed, realized and optimized which allows the mentioned experiments. In this contribution, the design of the cavity and the challenges of its realization are described, and measurement results concerning the first experimental operation in the SIS18 synchrotron are presented.
Keyword(s): Accelerator Physics ; mc7-accelerator-technology-and-sustainability - MC7: Accelerator Technology and Sustainability ; MC7.T06 - MC7.T06 Room Temperature RF
|
The record appears in these collections: |