| Home > Publications database > Measurements of the time-structure of the current to a single injection kicker module and simulation of its effect on the transverse beam dynamics in SIS100 |
| Contribution to a conference proceedings | GSI-2025-00406 |
; ; ; ; ; ; ; ; ;
2024
JACoW Publishing
Please use a persistent id in citations: doi:10.18429/JACOW-IPAC2024-WEPR61 doi:10.15120/GSI-2025-00406
Abstract: Distortions in the SIS100 injection kicker’s pulse time-form gives rise to beam emittance increase in the horizontal plane. Particle tracking simulations of the primary beam were carried out to try to predict the emittance at the end of the injection process for the modes of operation for antiproton (p̅) and Radioactive Ion Beam (RIB) production. The RIB cycle’s beam grew to just beyond the acceptance of the slow extraction separatrix at 27 Tm. During p̅ mode with the longitudinal RF cavities set to bunch the beam at the 5th harmonic of the beam revolution frequency instead of the originally planned 10th harmonic, the beam emittance increase was considerably reduced, resulting in -at most- negligible beam loss at the halo collimator.
Keyword(s): Accelerator Physics ; mc5-beam-dynamics-and-em-fields - MC5: Beam Dynamics and EM Fields ; MC5.D11 - MC5.D11 Code Developments and Simulation Techniques
|
The record appears in these collections: |