Beam commissioning of the demonstrator setup for the superconducting continuous wave HIM/GSI-Linac
Miski-Oglu, M.GSI* ; Aulenbacher, K.GSI* ; Barth, W.GSI* ; Basten, M.GSI* ; Burandt, C.GSI* ; Busch, M. ; Conrad, T. ; Dziuba, F.GSI* ; Gettmann, V.GSI* ; Heilmann, M.GSI* ; Kuerzeder, T.GSI* ; List, J.GSI* ; Lauber, S.GSI* ; Podlech, H. ; Rubin, A.GSI* ; Schnase, A.GSI* ; Schwarz, M.GSI* ; Yaramyshev, S.GSI*
2019
IOP Publ.39969
Bristol
This record in other databases: 
Please use a persistent id in citations: doi:10.1088/1742-6596/1350/1/012089 doi:10.15120/GSI-2020-00003
Note: "Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI. "
Contributing Institute(s):
- Linac (LIN)
- HIM / Accelerator Design and Integrated Detectors (MDI)
- UNILAC Post Stripper Upgrade (PSU)
- Engineering (ENG)
Research Program(s):
- 631 - Accelerator R & D (POF3-631) (POF3-631)
Appears in the scientific report
2019
Database coverage:
;

;

; SCOPUS